SG
Consult Request Consultation
Our Process

A clear path from first call
to final inspection.

No black boxes. Here's exactly what happens at each stage, how long it typically takes, and what we need from you.

  1. 01
    Step 01 · Consultation

    We listen first.

    A short call or site visit to understand your goals, constraints, and what's already been done. No charge, no obligation.

    Typical timeline

    30–45 minutes

    What we need from you

    A rough description of the project and any existing plans or photos, if available.

    What you walk away with

    A clear sense of scope and next steps.

  2. 02
    Step 02 · Site Review

    We assess what's actually there.

    Field assessment of existing conditions — structure, foundation, visible damage or risk — so design decisions are grounded in reality, not assumptions.

    Typical timeline

    1–2 hours on-site · written summary within 3–5 business days

    What we need from you

    Site access and any prior reports or surveys.

    What you walk away with

    A written site assessment.

  3. 03
    Step 03 · Planning & Design

    Structural and architectural concept comes together.

    We develop the structural approach and architectural plan in parallel, so the design and the engineering aren't fighting each other later.

    Typical timeline

    Typical range: 2–4 weeks depending on scope

    What we need from you

    Sign-off on the design direction and any revisions.

    What you walk away with

    Preliminary plans ready for engineering development.

  4. 04
    Step 04 · Engineering Review

    Stamped, calculated, and permit-ready.

    Full structural calculations, stamped drawings, and a permit-ready set prepared for Bay Area jurisdiction submittal.

    Typical timeline

    Typical range: 2–4 weeks after design direction is locked

    What we need from you

    Nothing — this stage is on us.

    What you walk away with

    An engineer-stamped, submittal-ready drawing set.

  5. 05
    Step 05 · Project Support

    We stay on through construction.

    On-call advisory through construction completion — RFIs, field questions, and inspection coordination, so nothing stalls because of a structural question.

    Typical timeline

    Through project completion

    What we need from you

    A heads-up when questions come up in the field.

    What you walk away with

    A completed, inspected, code-compliant structure.

Process FAQ

Common questions about
how we work.

It depends on scope and jurisdiction, but most residential projects run 8–16 weeks from consultation to permit-ready drawings, then continue into construction support. Inspections typically deliver in 5–7 business days; a focused plan set often lands in 3–8 weeks. We’ll give you a realistic range after the first call.

Both work. If you already have architectural plans, sketches or even just photos, send them along — we'll work from what you have. If you're starting from scratch, we can take the project from concept through stamped drawings.
Absolutely. We frequently come in as the structural engineer of record on projects where an architect is already engaged. We coordinate directly with their team so the structural design supports — rather than fights — the architectural intent.

We handle plan-check comments as part of the engagement. If the jurisdiction requests revisions, we respond, update the drawings, and resubmit — typically within one review cycle for residential work.

No — the first conversation is free. It's the only way for both of us to know if the project is a good fit before any paperwork or fees are involved.
Contact

Ready to start at step one?

Tell us what you're working on. The first conversation is free — and it's the fastest way to see if we're a fit.

Free Project Review

Start your project

Tell us a little — we'll respond within one business day.

Within one business day · Mon–Fri, 9am–5pm PT

Call Consultation