Redwood City, San Mateo County
Load-bearing wall removal and full reframe to open a 1960s plan without losing lateral capacity.
Owner-builder team wanted to open the main floor without losing lateral capacity in a high-seismic zone.
Engineered moment frame, new collector lines, and on-site coordination through demolition and reframe.
Open plan delivered with no structural reworks during construction.
Load-bearing wall removal and full reframe to open up a 1960s plan. [details to confirm]
Let's talk through the scope before you commit to anything.